Department of Workforce Development
Public Works Project and Wage Rate Information
07/04/2015 05:11:55 AM

STEWART AVENUE MEDIAN LANDSCAPING
WAUSAU CITY, MARATHON COUNTY, WI
Determination #: 201400269    Project #: 

Date Received: 02/04/2014   Date Issued: 02/04/2014
Estimated Cost: $120,000


Total Rows Found = 150
DO NOT USE THE DATA INDICATED BELOW FOR BIDDING OR FOR WORK PERFORMED ON A SPECIFIC PUBLIC WORKS PROJECT.   WAGE RATE CORRECTIONS ARE INDICATED BY THE CHANGE DATE.   OFFICAL WAGE RATES TO BE USED ARE CONTAINED IN THE PROJECT SPECIFICATIONS.

BUILDING OR HEAVY CONSTRUCTION

Includes sheltered enclosures with walk-in access for the purpose of housing persons, employees, machinery, equipment or supplies and non-sheltered work such as canals, dams, dikes, reservoirs, storage tanks, etc. A sheltered enclosure need not be "habitable" in order to be considered a building. The installation of machinery and/or equipment, both above and below grade level, does not change a project's character as a building. On-site grading, utility work and landscaping are included within this definition. Residential buildings of four (4) stories or less, agricultural buildings, parking lots and driveways are NOT included within this definition.

Change
SKILLED TRADES HBR FB's   Total  Date
101  Acoustic Ceiling Tile Installer  $30.48  $15.90  $46.38   
102  Boilermaker  $32.05  $28.04  $60.09   
  Future Note: Add $1.50/hr on 1/01/2015; Add $1.50/hr. on 01/01/2016
103  Bricklayer, Blocklayer or Stonemason  $31.34  $17.04  $48.38   
  Premium Note: DOT PREMIUM: Pay two times the hourly basic rate on Sunday, New Year’s Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day & Christmas Day.
104  Cabinet Installer  $30.48  $15.90  $46.38   
105  Carpenter  $30.48  $15.90  $46.38   
106  Carpet Layer or Soft Floor Coverer  $30.48  $15.90  $46.38   
107  Cement Finisher  $31.34  $16.84  $48.18   
108  Drywall Taper or Finisher  $13.00  $2.92  $15.92   
109  Electrician  $28.96  $16.90  $45.86  01/31/14 
  Future Note: Add $.70/hr on 6/2/2014; Add $.75/hr on 6/1/2015.
  Premium Note: DOT PREMIUM: Pay two times the hourly basic rate on Sunday, New Year’s Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day & Christmas Day.
110  Elevator Constructor  $42.86  $26.33  $69.19   
111  Fence Erector  $16.00  $0.31  $16.31   
112  Fire Sprinkler Fitter  $36.07  $18.73  $54.80   
113  Glazier  $28.09  $14.92  $43.01   
114  Heat or Frost Insulator  $29.34  $20.03  $49.37   
115  Insulator (Batt or Blown)  $15.00  $9.50  $24.50   
116  Ironworker  $31.25  $19.46  $50.71   
117  Lather  $30.48  $15.90  $46.38   
118  Line Constructor (Electrical)  $38.25  $16.28  $54.53  01/31/14 
119  Marble Finisher  $26.89  $18.69  $45.58   
120  Marble Mason  $31.34  $16.35  $47.69   
121  Metal Building Erector  $20.50  $2.37  $22.87   
122  Millwright  $32.11  $15.95  $48.06   
123  Overhead Door Installer  $20.95  $4.94  $25.89   
124  Painter  $26.00  $7.11  $33.11   
125  Pavement Marking Operator  $30.00  $0.00  $30.00   
126  Piledriver  $30.98  $15.90  $46.88   
127  Pipeline Fuser or Welder (Gas or Utility)  $30.79  $19.74  $50.53   
129  Plasterer  $30.85  $17.62  $48.47   
130  Plumber  $34.45  $15.92  $50.37   
132  Refrigeration Mechanic  $34.45  $15.92  $50.37   
133  Roofer or Waterproofer  $29.40  $6.85  $36.25  04/25/14 
134  Sheet Metal Worker  $27.60  $22.60  $50.20  04/25/14 
135  Steamfitter  $34.45  $15.92  $50.37   
137  Teledata Technician or Installer  $22.25  $12.24  $34.49   
  Premium Note: DOT PREMIUM: Pay two times the hourly basic rate on Sunday, New Year’s Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day & Christmas Day.
138  Temperature Control Installer  $32.59  $5.81  $38.40   
139  Terrazzo Finisher  $26.89  $18.69  $45.58   
140  Terrazzo Mechanic  $30.20  $18.42  $48.62   
141  Tile Finisher  $23.85  $17.18  $41.03   
142  Tile Setter  $31.34  $17.04  $48.38   
143  Tuckpointer, Caulker or Cleaner  $31.34  $16.35  $47.69  02/28/14 
144  Underwater Diver (Except on Great Lakes)  $34.48  $15.90  $50.38   
146  Well Driller or Pump Installer  $25.32  $15.65  $40.97   
147  Siding Installer  $25.92  $18.04  $43.96   
150  Heavy Equipment Operator - ELECTRICAL LINE CONSTRUCTION ONLY  $29.16  $14.34  $43.50   
151  Light Equipment Operator -ELECTRICAL LINE CONSTRUCTION ONLY  $30.60  $14.86  $45.46   
152  Heavy Truck Driver - ELECTRICAL LINE CONSTRUCTION ONLY  $26.78  $13.63  $40.41   
153  Light Truck Driver - ELECTRICAL LINE CONSTRUCTION ONLY  $24.86  $12.97  $37.83   
154  Groundman - ELECTRICAL LINE CONSTRUCTION ONLY  $21.75  $12.67  $34.42  02/01/14 
Change
TRUCK DRIVERS HBR FB's   Total  Date
201  Single Axle or Two Axle  $24.37  $17.77  $42.14  02/28/14 
  Future Note: Add $1.30/hr on 6/1/2014.
  Premium Note: DOT PREMIUM: Pay two times the hourly basic rate on Sunday, New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day & Christmas Day.
203  Three or More Axle  $24.52  $17.77  $42.29  02/28/14 
  Future Note: Add $1.30/hr on 6/1/2014.
  Premium Note: DOT PREMIUM: Pay two times the hourly basic rate on Sunday, New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day & Christmas Day.
204  Articulated, Euclid, Dumptor, Off Road Material Hauler  $32.89  $18.96  $51.85  02/28/14 
205  Pavement Marking Vehicle  $23.31  $17.13  $40.44  02/28/14 
207  Truck Mechanic  $23.31  $17.13  $40.44  02/28/14 
Change
LABORERS HBR FB's   Total  Date
301  General Laborer  $23.48  $14.61  $38.09  01/05/14 
  Premium Note: Add $1.00/hr for certified welder and pipelayer; Add $.25/hr for mason tender
302  Asbestos Abatement Worker  $25.36  $14.52  $39.88   
303  Landscaper  $18.00  $0.48  $18.48   
310  Gas or Utility Pipeline Laborer (Other Than Sewer and Water)  $19.86  $13.63  $33.49   
311  Fiber Optic Laborer (Outside, Other Than Concrete Encased)  $15.00  $4.99  $19.99   
314  Railroad Track Laborer  $23.46  $10.49  $33.95   
315  Final Construction Clean-Up Worker  $28.31  $16.62  $44.93   
Change
HEAVY EQUIPMENT OPERATORS: SITE PREPARATION, UTILITY, OR LANDSCAPING WORK ONLY HBR FB's   Total  Date
501  Air Track, Rotary or Percussion Drilling Machine &/or Hammers, Blaster; Asphalt Milling Machine; Bor...  $32.39  $18.67  $51.06  02/28/14 
502  Backfiller; Broom or Sweeper; Bulldozer or Endloader (Under 40 hp); Environmental Burner; Forestry E...  $32.89  $18.96  $51.85  02/28/14 
503  Air Compressor (&/or 400 CFM or Over); Augers (Vertical & Horizontal); Compactor (Self-Propelled 84 ...  $32.89  $18.96  $51.85  02/28/14 
Change
HEAVY EQUIPMENT OPERATORS: EXCLUDING SITE PREPARATION, UTILITY, PAVING, OR LANDSCAPING WORK HBR FB's   Total  Date
508  Boring Machine (Directional); Crane, Tower Crane, Pedestal Tower or Derrick, With or Without Attachm...  $35.62  $18.96  $54.58  02/28/14 
  Premium Note: Add $.50/hr for >200 Ton / Add $1/hr at 300 Ton / Add $1.50/hr at 400 Ton / Add $2/hr at 500 Ton & Over.
509  Backhoe (Track Type) Having a Mfgr's Rated Capacity of 130,000 Lbs. or Over; Boring Machine (Horizon...  $34.62  $18.96  $53.58  02/28/14 
  Premium Note: Add $.25/hr for all >45 Ton lifting capacity cranes
510  Backhoe (Track Type) Having a Mfgr.'s Rated Capacity of Under 130,000 Lbs., Backhoe (Mini, 15,000 Lb...  $33.42  $18.96  $52.38  02/28/14 
511  Air, Track, Rotary or Percussion Drilling Machine &/or Hammers, Blaster; Bulldozer or Endloader (Ove...  $32.89  $18.96  $51.85  02/28/14 
512  Backfiller; Broom or Sweeper; Bulldozer or Endloader (Under 40 hp); Compactor (Self-Propelled 84 Ft ...  $30.82  $18.96  $49.78  02/28/14 
513  Air Compressor (&/or 400 CFM or Over); Air, Electric or Hydraulic Jacking System; Augers (Vertical &...  $30.19  $18.96  $49.15  02/28/14 
514  Gas or Utility Pipeline, Except Sewer & Water (Primary Equipment).  $36.34  $21.14  $57.48  02/28/14 
515  Gas or Utility Pipeline, Except Sewer & Water (Secondary Equipment).  $32.32  $18.55  $50.87  02/28/14 
  Future Note: Add $1.60/hr on 06/01/2014; Add $1.65/hr on 06/01/2015.
516  Fiber Optic Cable Equipment  $26.69  $8.08  $34.77  02/28/14 
DO NOT USE THE DATA INDICATED BELOW FOR BIDDING OR FOR WORK PERFORMED ON A SPECIFIC PUBLIC WORKS PROJECT.   WAGE RATE CORRECTIONS ARE INDICATED BY THE CHANGE DATE.   OFFICAL WAGE RATES TO BE USED ARE CONTAINED IN THE PROJECT SPECIFICATIONS.

SEWER, WATER OR TUNNEL CONSTRUCTION

Includes those projects that primarily involve public sewer or water distribution, transmission or collection systems and related tunnel work (excluding buildings).

Change
SKILLED TRADES HBR FB's   Total  Date
103  Bricklayer, Blocklayer or Stonemason  $35.10  $18.40  $53.50   
  Premium Note: DOT PREMIUM: Pay two times the hourly basic rate on Sunday, New Year’s Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day & Christmas Day.
105  Carpenter  $33.68  $19.81  $53.49   
  Future Note: Add $1.25/hr on 6/2/2014.
  Premium Note: DOT PREMIUM: Pay two times the hourly basic rate on Sunday, New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day & Christmas Day.
107  Cement Finisher  $33.51  $16.13  $49.64   
  Future Note: Add $1.87 on 6/1/14; Add $1.87 on 6/1/15; Add $1.75 on 6/1/16.
  Premium Note: DOT PREMIUMS: 1) Pay two times the hourly basic rate on Sunday, New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day & Christmas Day. 2) Add $1.40/hr when the Wisconsin Department of Transportation or responsible governing agency requires that work be performed at night under artificial illumination with traffic control and the work is completed after sunset and before sunrise.
109  Electrician  $32.82  $22.61  $55.43  01/31/14 
  Premium Note: DOT PREMIUM: Pay two times the hourly basic rate on Sunday, New Year’s Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day & Christmas Day.
111  Fence Erector  $16.00  $0.31  $16.31   
116  Ironworker  $31.25  $19.46  $50.71   
118  Line Constructor (Electrical)  $38.25  $16.28  $54.53  01/31/14 
125  Pavement Marking Operator  $16.00  $1.16  $17.16   
126  Piledriver  $30.98  $15.90  $46.88   
130  Plumber  $33.75  $10.10  $43.85   
135  Steamfitter  $33.75  $15.77  $49.52   
137  Teledata Technician or Installer  $21.89  $11.85  $33.74   
143  Tuckpointer, Caulker or Cleaner  $31.34  $16.35  $47.69  02/28/14 
144  Underwater Diver (Except on Great Lakes)  $38.80  $20.17  $58.97  01/31/14 
146  Well Driller or Pump Installer  $25.32  $15.65  $40.97   
150  Heavy Equipment Operator - ELECTRICAL LINE CONSTRUCTION ONLY  $29.16  $14.34  $43.50   
151  Light Equipment Operator -ELECTRICAL LINE CONSTRUCTION ONLY  $30.60  $14.86  $45.46   
152  Heavy Truck Driver - ELECTRICAL LINE CONSTRUCTION ONLY  $26.78  $13.63  $40.41   
153  Light Truck Driver - ELECTRICAL LINE CONSTRUCTION ONLY  $24.86  $12.97  $37.83   
154  Groundman - ELECTRICAL LINE CONSTRUCTION ONLY  $21.75  $12.67  $34.42  01/31/14 
Change
TRUCK DRIVERS HBR FB's   Total  Date
201  Single Axle or Two Axle  $30.00  $15.00  $45.00  02/28/14 
203  Three or More Axle  $16.00  $1.16  $17.16  02/28/14 
204  Articulated, Euclid, Dumptor, Off Road Material Hauler  $32.89  $18.96  $51.85  02/28/14 
205  Pavement Marking Vehicle  $16.00  $1.16  $17.16  02/28/14 
207  Truck Mechanic  $16.00  $1.16  $17.16  02/28/14 
Change
LABORERS HBR FB's   Total  Date
301  General Laborer  $25.35  $14.62  $39.97  01/05/14 
  Premium Note: Add $.20 for blaster, bracer, manhole builder, caulker, bottomman and power tool; Add $.55 for pipelayer; Add $1.00 for 0-15 lbs. compressed air; Add $2.00 for 15-30 lbs. compressed air; Add $3.00 for over 30 lbs. compressed air.
303  Landscaper  $25.28  $11.46  $36.74   
304  Flagperson or Traffic Control Person  $17.41  $10.10  $27.51   
311  Fiber Optic Laborer (Outside, Other Than Concrete Encased)  $15.00  $4.99  $19.99   
314  Railroad Track Laborer  $23.46  $10.49  $33.95   
Change
HEAVY EQUIPMENT OPERATORS: SEWER, WATER OR TUNNEL CONSTRUCTION HBR FB's   Total  Date
521  Backhoe (Track Type) Having a Mfgr.'s Rated Capacity of 130,000 Lbs. or Over; Caisson Rig; Crane, To...  $36.84  $19.45  $56.29  02/28/14 
  Future Note: Add $1.05/hr on 6/2/2014; Add $1.55/hr on 6/1/2015.
  Premium Note: Add $.25/hr for operating tower crane.
522  Backhoe (Track Type) Having a Mfgr.'s Rated Capacity of Under 130,000 Lbs., Backhoe (Mini, 15,000 Lb...  $33.42  $18.96  $52.38  02/28/14 
523  Air Track, Rotary or Percussion Drilling Machine &/or Hammers, Blaster; Boring Machine (Horizontal o...  $32.89  $18.96  $51.85  02/28/14 
524  Backfiller; Broom or Sweeper; Bulldozer or Endloader (Under 40 hp); Compactor (Self-Propelled 85 Ft ...  $35.11  $19.45  $54.56  02/28/14 
  Future Note: Add $1.05/hr on 6/2/2014; Add $1.55/hr on 6/1/2015.
  Premium Note: Add $.25/hr for operating tower crane.
525  Air Compressor (&/or 400 CFM or Over); Air, Electric or Hydraulic Jacking System; Augers (Vertical &...  $30.19  $20.94  $51.13  02/28/14 
526  Boiler (Temporary Heat); Forklift; Greaser; Oiler.  $29.69  $18.46  $48.15  02/28/14 
DO NOT USE THE DATA INDICATED BELOW FOR BIDDING OR FOR WORK PERFORMED ON A SPECIFIC PUBLIC WORKS PROJECT.   WAGE RATE CORRECTIONS ARE INDICATED BY THE CHANGE DATE.   OFFICAL WAGE RATES TO BE USED ARE CONTAINED IN THE PROJECT SPECIFICATIONS.

LOCAL STREET OR MISCELLANEOUS PAVING CONSTRUCTION

Includes roads, streets, alleys, trails, bridges, paths, racetracks, parking lots and driveways (except residential or agricultural), public sidewalks or other similar projects (excluding projects awarded by the Wisconsin Department of Transportation).

Change
SKILLED TRADES HBR FB's   Total  Date
103  Bricklayer, Blocklayer or Stonemason  $31.34  $16.35  $47.69   
105  Carpenter  $30.48  $16.00  $46.48   
107  Cement Finisher  $31.52  $12.08  $43.60   
109  Electrician  $31.27  $22.81  $54.08  01/31/14 
111  Fence Erector  $16.00  $0.31  $16.31   
116  Ironworker  $31.25  $19.46  $50.71   
118  Line Constructor (Electrical)  $38.25  $16.28  $54.53  01/31/14 
124  Painter  $26.00  $7.11  $33.11   
125  Pavement Marking Operator  $30.00  $0.00  $30.00   
126  Piledriver  $30.98  $15.90  $46.88   
133  Roofer or Waterproofer  $29.40  $6.85  $36.25  04/25/14 
137  Teledata Technician or Installer  $21.89  $11.85  $33.74   
143  Tuckpointer, Caulker or Cleaner  $31.34  $16.35  $47.69  02/28/14 
144  Underwater Diver (Except on Great Lakes)  $38.80  $20.17  $58.97  01/31/14 
150  Heavy Equipment Operator - ELECTRICAL LINE CONSTRUCTION ONLY  $34.43  $15.24  $49.67   
151  Light Equipment Operator -ELECTRICAL LINE CONSTRUCTION ONLY  $30.60  $14.86  $45.46   
152  Heavy Truck Driver - ELECTRICAL LINE CONSTRUCTION ONLY  $26.78  $13.63  $40.41   
153  Light Truck Driver - ELECTRICAL LINE CONSTRUCTION ONLY  $24.86  $12.97  $37.83   
154  Groundman - ELECTRICAL LINE CONSTRUCTION ONLY  $21.75  $12.67  $34.42  01/31/14 
Change
TRUCK DRIVERS HBR FB's   Total  Date
201  Single Axle or Two Axle  $30.00  $15.00  $45.00  02/28/14 
203  Three or More Axle  $14.75  $3.74  $18.49  02/28/14 
204  Articulated, Euclid, Dumptor, Off Road Material Hauler  $32.89  $18.96  $51.85  02/28/14 
205  Pavement Marking Vehicle  $14.75  $3.74  $18.49  02/28/14 
206  Shadow or Pilot Vehicle  $30.00  $15.00  $45.00  02/28/14 
207  Truck Mechanic  $14.75  $3.74  $18.49  02/28/14 
Change
LABORERS HBR FB's   Total  Date
301  General Laborer  $17.41  $10.10  $27.51  01/05/14 
303  Landscaper  $29.04  $14.63  $43.67   
  Future Note: Add $1.60/hr on 6/1/14.
  Premium Note: DOT PREMIUMS: 1) Pay two times the hourly basic rate on Sunday, New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day & Christmas Day. 2) Add $1.25/hr for work on projects involving temporary traffic control setup, for lane and shoulder closures, when work under artificial illumination conditions is necessary as required by the project provisions (including prep time prior to and/or cleanup after such time period).
304  Flagperson or Traffic Control Person  $17.41  $10.10  $27.51   
311  Fiber Optic Laborer (Outside, Other Than Concrete Encased)  $15.00  $4.99  $19.99   
314  Railroad Track Laborer  $23.46  $10.49  $33.95   
Change
HEAVY EQUIPMENT OPERATORS: CONCRETE PAVEMENT OR BRIDGE WORK ONLY HBR FB's   Total  Date
541  Crane, Tower Crane, Pedestal Tower or Derrick, With or Without Attachments, With a Lifting Capacity ...  $36.72  $20.40  $57.12  02/28/14 
  Future Note: Add $1.75/hr on 6/1/2014); Add $1.25/hr on 6/1/2015); Add $1.30/hr on 6/1/2016); Add $1.25/hr on 6/1/2017.
  Premium Note: DOT PREMIUMS: 1) Pay two times the hourly basic rate on Sunday, New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day & Christmas Day. 2) Add $1.50/hr night work premium. See DOT'S website for details about the applicability of this night work premium at: http://www.dot.wi.gov/business/civilrights/laborwages/pwc.htm.
542  Backhoe (Track Type) Having a Mfgr.'s Rated Capacity of 130,000 Lbs. or Over; Caisson Rig; Crane, To...  $36.22  $20.40  $56.62  02/28/14 
  Future Note: Add $1.75/hr on 6/1/2014); Add $1.25/hr on 6/1/2015); Add $1.30/hr on 6/1/2016); Add $1.25/hr on 6/1/2017.
  Premium Note: DOT PREMIUMS: 1) Pay two times the hourly basic rate on Sunday, New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day & Christmas Day. 2) Add $1.50/hr night work premium. See DOT'S website for details about the applicability of this night work premium at: http://www.dot.wi.gov/business/civilrights/laborwages/pwc.htm.
543  Air Track, Rotary or Percussion Drilling Machine &/or Hammers, Blaster; Automatic Subgrader (Concret...  $35.72  $20.40  $56.12  02/28/14 
  Future Note: Add $1.75/hr on 6/1/2014); Add $1.25/hr on 6/1/2015); Add $1.30/hr on 6/1/2016); Add $1.25/hr on 6/1/2017.
  Premium Note: DOT PREMIUMS: 1) Pay two times the hourly basic rate on Sunday, New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day & Christmas Day. 2) Add $1.50/hr night work premium. See DOT'S website for details about the applicability of this night work premium at: http://www.dot.wi.gov/business/civilrights/laborwages/pwc.htm.
544  Backfiller; Belting, Burlap, Texturing Machine; Broom or Sweeper; Compactor (Self-Propelled or Tract...  $35.46  $20.40  $55.86  02/28/14 
  Future Note: Add $1.75/hr on 6/1/2014); Add $1.25/hr on 6/1/2015); Add $1.30/hr on 6/1/2016); Add $1.25/hr on 6/1/2017.
  Premium Note: DOT PREMIUMS: 1) Pay two times the hourly basic rate on Sunday, New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day & Christmas Day. 2) Add $1.50/hr night work premium. See DOT'S website for details about the applicability of this night work premium at: http://www.dot.wi.gov/business/civilrights/laborwages/pwc.htm.
545  Air Compressor (&/or 400 CFM or Over); Air, Electric or Hydraulic Jacking System; Automatic Belt Con...  $32.39  $18.46  $50.85  02/28/14 
546  Fiber Optic Cable Equipment.  $26.69  $8.08  $34.77  02/28/14 
Change
HEAVY EQUIPMENT OPERATORS: ASPHALT PAVEMENT OR OTHER WORK HBR FB's   Total  Date
551  Crane, Tower Crane, Pedestal Tower or Derrick, With or Without Attachments, With a Lifting Capacity ...  $35.12  $18.46  $53.58  02/28/14 
552  Backhoe (Track Type) Having a Mfgr.'s Rated Capacity of 130,000 Lbs. or Over; Caisson Rig; Crane, To...  $36.22  $20.40  $56.62  02/28/14 
  Future Note: Add $1.75/hr on 6/1/2014); Add $1.25/hr on 6/1/2015); Add $1.30/hr on 6/1/2016); Add $1.25/hr on 6/1/2017.
  Premium Note: DOT PREMIUMS: 1) Pay two times the hourly basic rate on Sunday, New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day & Christmas Day. 2) Add $1.50/hr night work premium. See DOT'S website for details about the applicability of this night work premium at: http://www.dot.wi.gov/business/civilrights/laborwages/pwc.htm.
553  Air, Track, Rotary or Percussion Drilling Machine &/or Hammers, Blaster; Asphalt Heater, Planer & Sc...  $28.65  $19.20  $47.85  02/28/14 
  Future Note: Add $1.75/hr on 6/1/2014; Add $1.25/hr on 6/1/2015; Add $1.30/hr on 6/1/2016; Add $1.25/hr on 6/1/2017.
554  Backfiller; Broom or Sweeper; Compactor (Self-Propelled or Tractor Mounted, Towed & Light Equipment)...  $28.65  $19.20  $47.85  02/28/14 
  Future Note: Add $1.75/hr on 6/1/2014; Add $1.25/hr on 6/1/2015; Add $1.30/hr on 6/1/2016; Add $1.25/hr on 6/1/2017.
555  Air Compressor (&/or 400 CFM or Over); Air, Electric or Hydraulic Jacking System; Augers (Vertical &...  $35.17  $20.40  $55.57  02/28/14 
  Future Note: Add $1.75/hr on 6/1/2014); Add $1.25/hr on 6/1/2015); Add $1.30/hr on 6/1/2016); Add $1.25/hr on 6/1/2017.
  Premium Note: DOT PREMIUMS: 1) Pay two times the hourly basic rate on Sunday, New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day & Christmas Day. 2) Add $1.50/hr night work premium. See DOT'S website for details about the applicability of this night work premium at: http://www.dot.wi.gov/business/civilrights/laborwages/pwc.htm.
556  Fiber Optic Cable Equipment.  $26.69  $8.08  $34.77  02/28/14